ZAHROOF VALVES MAKE OFFSHORE EASIER

ZAHROOF VALVES PAY FOR THEMSELVES IN 6 WEEKS

GAS GATHERING APPLICATION

ZAHROOF VALVES MAKE OFFSHORE EASIER

compressor repair, valves operating without maintenance

The legacy plate valves of an offshore E&P company are failing one to two times per week. Large numbers of spare valves must be kept on hand. Pulled valves must be transported to shore for machining.

Increase Annual Production - Zahroof StraightFlo Valves

StraightFlo™ Valves operate for approximately 4 weeks —a 6X increase in MTBF. On site servicing (with < 5% of modules being changed) eliminates the need to stockpile spares or transport valves to shore for repair. Zahroof is continuing to collaborate with the customer to further extend valve life.

Increase Annual Production, valves operating without maintenance

ZAHROOF VALVES OPERATE FOR APPROX. 4 WEEKS – A 6X INCREASE IN MTBF.

compressor repair

Segment: Offshore E&P Co.
Location: Gulf of Mexico (shelf)
Compressor: Ariel JGD/6 (shelf)
Date Installed: June 2020

REDEFINING VALVE LIFE IN YEARS INSTEAD OF MONTHS